Sector

Construction & Engineering: connected operational assurance.

Design, mobilisation, contractor and site-control assurance.

Request a RAMS quote

Plan your next step

New RAMS or an existing document to review?

Tell us the work activity, site context and client deadline. We will agree the scope, information needed and delivery arrangements before work starts.

Download the RAMS project-brief checklist (plain text). No signup needed. It helps you prepare a brief; it is not a completed risk assessment.

Who this helps

Built around a buying situation.

  • Construction clients and contractors
  • Engineering project leaders
  • SHEQ and mobilisation teams

Useful when

The trigger is already visible.

  • Design information and site method are diverging
  • Supply-chain evidence is late or generic
  • Handover risk is accumulating during delivery

The position

Connect design intent to site control.

Pegasus helps turn requirements and design assumptions into briefable delivery controls, supplier expectations, change decisions and acceptance evidence across the project lifecycle.

01

A defined scope and accountable decision owners

02

Controls matched to the real operating context

03

Evidence that can be reviewed, tested and improved

Scope

What the work includes.

Every engagement is scoped around authority, operating context, available evidence and the decision that must be made.

01

Context and exposure

Clarify design, scope, interfaces, hazards, constraints, resources and evidence requirements.

02

Integrated control plan

Support mobilisation, RAMS, contractor assurance, DSEAR or fire controls and controlled change.

03

Verification and improvement

Track inspection, testing, defects, actions, records and handover readiness.

Method

A controlled route from exposure to evidence.

Decision points, responsibilities and verification stay visible from the start.

01

Discover

Define the exposure, context, evidence, owners and decision that matters.

02

Design

Select proportionate controls and make responsibilities and hold points visible.

03

Implement

Embed the agreed system into the real operating workflow.

04

Verify

Test whether controls work and whether the evidence supports the conclusion.

05

Improve

Close actions, learn from exceptions and strengthen the system over time.

Outputs

Evidence designed for use.

Scope and evidence map

Prioritised findings and action ownership

Practical control or implementation pack

Verification record and next-step roadmap

Questions answered

Before you scope the work.

Can support begin after mobilisation?

Yes, but early involvement provides more opportunity to remove uncertainty before work and commercial pressure narrow the available choices.

Start the conversation

Bring the exposure. Leave with a controlled route forward.

A first conversation is used to understand context, authority and the decision required—not to force a predetermined package.

Request a RAMS quote